Brighton, Colorado | Olive

timber frame worker standing on a purlin over an exterior deck off the great room

Our crew continues work in the Colorado high plains outside of Denver, entrenched in the final days of a twelve day build that will add our olive design to the wind swept landscape.

Our clients are hands-on, struggling alongside our crew late into the day while they grade out the land and install SIPs walls around the garage.

The biggest challenge with the job to this point has been the wind. In addition to sucking the moisture from everything (we crushed a lot of chapstick) the wind tends to grab hold of our SIPs panels like sails — not a huge deal when you’re standing up walls, but a definite challenge on the roof.

A couple more days here then our crew splits after the holiday to locations in Iowa and Michigan. Updates on those builds to follow.  But for now, more pics from Colorado.